The U.S. Coast Guard has awarded two contracts worth a combined $184.3 million — one to build a new science and technology facility and another to renovate an existing academic building at the U.S. Coast Guard Academy in New London, Connecticut.
The service funded the contracts through the nearly $25 billion allocated to the Coast Guard under the 2025 Working Families Tax Cuts Act — enacted as President Donald Trump’s One Big Beautiful Bill Act — according to the service.
The new “projects will provide safe, reliable and resilient facilities that support the academy’s long-term mission of developing Coast Guard officers,” the Coast Guard said in a statement Wednesday.
New STEM Facility
The service announced it has awarded a $155 million contract to The Whiting-Turner Contracting Co., of Greenbelt, Maryland, to construct a new Science, Technology, Engineering and Mathematics, or STEM, facility at the academy.
Awarded Nov. 16, the contract will fund a 120,000-square-foot building, which will be known as STEM West, to modernize academy facilities and prepare cadets to serve in technologically advanced maritime environments.
The facility will house the Coast Guard’s chemistry, naval architecture and marine engineering, and civil and environmental engineering programs.
Construction is expected to finish in spring 2030, the service said.
Waesche Hall Renovations
Separately, the Coast Guard on Sept. 29 awarded a $29.3 million contract to Healtheon Inc., of New Orleans, to renovate and repair Waesche Hall, which houses classrooms, offices and thousands of historic maritime artifacts, according to the service.
In a project scheduled for completion in May 2029, workers will modernize about 40,000 square feet of the 60,000-square-foot building.
The work includes repairs to bathrooms, faculty offices, classrooms, bookshelves and admissions department spaces, as well as reconfiguring the first-floor museum exhibit area for a projection screen and temporary foldable assembly seating.
Crews will also add three classrooms, library space, offices and academic department spaces to the building’s second floor.
“The STEM West and the Waesche Hall projects provide the modern learning facilities necessary to prepare cadets to solve the complex maritime challenges facing the Coast Guard and the nation.”
— Rear Adm. Greg Rothrock, superintendent of the U.S. Coast Guard Academy
Rear Adm. Greg Rothrock, superintendent of the U.S. Coast Guard Academy, said in a statement that the two projects will give cadets updated classrooms and labs built for modern maritime challenges.
The awards follow other recent campus construction projects. In August, the Coast Guard awarded a $51 million contract to renovate Chase Hall Annex A, the historic barracks housing the Corps of Cadets with exterior, electrical, heating and ventilation, and living-quarter upgrades scheduled to wrap up in August 2028, according to the service.
“These investments strengthen the academy’s ability to educate, develop and prepare the next generation of Coast Guard leaders,” Rothrock said.
Read the full article here

22 Comments
The cost guidance is better than expected. If they deliver, the stock could rerate.
If AISC keeps dropping, this becomes investable for me.
Good point. Watching costs and grades closely.
Good point. Watching costs and grades closely.
Interesting update on Coast Guard Academy Lands $184.3M for New STEM Building, Hall Overhaul. Curious how the grades will trend next quarter.
Good point. Watching costs and grades closely.
Good point. Watching costs and grades closely.
Uranium names keep pushing higher—supply still tight into 2026.
Production mix shifting toward USA might help margins if metals stay firm.
Good point. Watching costs and grades closely.
Good point. Watching costs and grades closely.
Interesting update on Coast Guard Academy Lands $184.3M for New STEM Building, Hall Overhaul. Curious how the grades will trend next quarter.
Good point. Watching costs and grades closely.
Good point. Watching costs and grades closely.
Exploration results look promising, but permitting will be the key risk.
Production mix shifting toward USA might help margins if metals stay firm.
Uranium names keep pushing higher—supply still tight into 2026.
Good point. Watching costs and grades closely.
Good point. Watching costs and grades closely.
I like the balance sheet here—less leverage than peers.
Interesting update on Coast Guard Academy Lands $184.3M for New STEM Building, Hall Overhaul. Curious how the grades will trend next quarter.
Good point. Watching costs and grades closely.